Industrial & Power

The £3.5bn Laggan-Tormore project involved the construction of a gas processing plant and export pipeline in the Shetlands, which went online in February 2016. Capable of processing 90,000 barrels of oil per day our scope included the installation of 1,250km of cable where we achieved the installation of over 70km on a weekly basis in weather conditions typical of a remote Scottish island.

ClientRandridge International Ltd
ProjectLaggan-Tormore Development, Shetland

The new 880mW gas fired power station utilises state of the art gas combined cycle technology and will generate electricity for 1,000,000 homes. The plant is one of the most efficient power stations in the UK.

ClientDornan Engineering Services Ltd
ProjectCCGT Carrington Power Station

Utilising advanced plasma gasification energy-from-waste technology and with the potential to generate 49.9mW of power and remove 350,000 Tonnes of non-recyclable waste from landfill. The Tees Valley facilities are the first of their kind in the UK, and the largest of their kind anywhere in the world.

ClientImtech Suir
ProjectTees Valley Energy from Waste (EfW)

With 10% of the UK’s gas requirements coming from the site. Theddlethorpe Gas Terminal is one of the largest gas plants in the UK. The Freon Replacement project replaced the old refrigeration system with a new Propane based refrigerant (R-290).

ClientAMEC
ProjectTGT Freon Replacement Project, Theddlethorpe

Following the Tohuku earthquake and events at the Fukushima Nuclear Power Plant in Japan, Sellafield Ltd implemented a programme to review the resilience of the plant against extreme situations. The SSEP or Site Security Enhancement Project was one of these initiatives.

ClientBBESL & Shepley Engineering Ltd
ProjectSSEP Island Sites, Sellafield

Wytch Farm is Europe’s largest onshore oil field. It is estimated the field contains reserves of 65.40 million tonnes of oil (479.6 million barrels), 4.73 million tonnes of natural gas liquids and 1.42 billion cubic metres of natural gas that will last until 2020 and 2025 respectively.

ClientSSE Contracting
ProjectWytch Farm (Perenco)

Based in Immingham, this facility supplies Drax Power Station with biomass (wood pellets) and consists of an automated biomass handling terminal which utilises continuous ship unloaders, with rail and road export facilities.

ClientEngenda
ProjectHumber International Bulk Terminal (Renewable Fuels)